I connect five units of PCZ1000A in parallel and set the load current to 25 Arms, however the load current flows at only 5 Arms. What should I do?

If the protection function has been activated with the alarm, clear it and eliminate the cause of the alarm.
If the alarm hasn’t be activated, read the user’s manual to check the following settings:

A) The connection of the flat cable for parallel operation and the load cable
B) The CONFIG settings
C) The input voltage range set in the input voltage range selection switch