Read the setup guide (page 4 for ‘Connecting the Power Cable’).
For the smart rack system (PAT-TM/TMX series), the M8 screw is for the 16-32 kW systems, and the M10 screw is for the 40 kW system.
Read the setup guide (page 4 for ‘Connecting the Power Cable’).
For the smart rack system (PAT-TM/TMX series), the M8 screw is for the 16-32 kW systems, and the M10 screw is for the 40 kW system.